An operation manager wants to assign tasks to workstations as efficiently as possible. Management desires an...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
An operation manager wants to assign tasks to workstations as efficiently as possible. Management desires an output rate of 40 units per day. The tasks shown in the following table are to be assigned to minimize the percentage of idle time. Assume 480 minutes are available per day. Task Performance time (min) A 4 B 7 C 5 D 6 E 6 F 7 G H 8 6 Immediate predecessors --- A, B C D E E F, G a. Draw a precedence diagram of this operation. Determine the appropriate cycle time. What is the theoretical minimum number of workstations? Assign tasks to workstations using longest operation time. What is the actual number of stations? How much total idle time is present each day? What is the overall efficiency of the assembly line? b. What is/are the bottleneck task(s) of the assembly line if the operation manager assigns one employee per task? What is the hourly capacity of the line (in units per hour) if the operation manager assigns one employee per task? c. What are the minimum and maximum cycle times? What is an hourly range of theoretical output possible for this assembly line? An operation manager wants to assign tasks to workstations as efficiently as possible. Management desires an output rate of 40 units per day. The tasks shown in the following table are to be assigned to minimize the percentage of idle time. Assume 480 minutes are available per day. Task Performance time (min) A 4 B 7 C 5 D 6 E 6 F 7 G H 8 6 Immediate predecessors --- A, B C D E E F, G a. Draw a precedence diagram of this operation. Determine the appropriate cycle time. What is the theoretical minimum number of workstations? Assign tasks to workstations using longest operation time. What is the actual number of stations? How much total idle time is present each day? What is the overall efficiency of the assembly line? b. What is/are the bottleneck task(s) of the assembly line if the operation manager assigns one employee per task? What is the hourly capacity of the line (in units per hour) if the operation manager assigns one employee per task? c. What are the minimum and maximum cycle times? What is an hourly range of theoretical output possible for this assembly line?
Expert Answer:
Related Book For
Posted Date:
Students also viewed these general management questions
-
A manager wants to assign tasks to workstations in order to achieve an hourly output rate of four units. The department uses a working time of 56 minutes per hour. a. Assign the tasks shown in the...
-
A manager wants to assign tasks to workstations to achieve an hourly output rate of 33 units. Assume that the shop works 60 minutes per hour (i.e., no breaks). a. Assign the tasks shown in the...
-
Integer sort. Write a linear-time filter that reads from standard input a sequence of integers that are between 0 and 99 and prints to standard output the same integers in sorted order. For example,...
-
Honk, Inc., a U.S. corporation, purchases weight-lifting equipment for resale from HiDisu, a Japanese corporation, for 60 million yen. On the date of purchase, 120 yen is equal to $1 U.S. (120:$1)....
-
David Barnes and his fiancée Valerie Shah are visiting Hawaii. At the Hawaiian Cultural Center in Honolulu, they are told that 2 out of a group of 8 people will be randomly picked for a free...
-
For a good refrigerant (a) Ozone Depletion Potential should be high and Global Warming Potential should be less (b) Ozone Depletion Potential should be less and Global Warming Potential should be...
-
Lisa Surowsky was asked to help in determining the best ordering policy for a new product. Currently, the demand for the new product has been projected to be about 1,000 units annually. To get a...
-
Draw an ERD Diagram (Crowfoot diagram) for the following: Diagram for Mobile [All the entities associated with mobile(at least 3), The relationship between them and also show the...
-
1. What is the cost of debt for Sunrise Bakery? 2. What is their cost of equity? 3. What is the WACC? 4. Which cost of capital should be used to evaluate the feasibility of the oven purchase? 5....
-
Think about a situation that you have witness at your own work, or that you have read or heard about in which introducing an outsider as a strategic management strategy ended up clashing with...
-
Identify under each scenario whether an express warranty was created. If a warranty was created, specify whether it is fact/promise, description, or model. 1. "This knife will cut through a can." 2....
-
Medicare Payment Advisory Commission (MedPAC) is a group of experts who work part time for Congress to figure out ways to make Medicare work better. Take a look at the 2014 MedPAC Report and an...
-
Bill ordered an airplane from Fullerton Aircraft for his own personal use. Bill took delivery of the aircraft and flew it for several months before determining that it caused him joint pain due to...
-
Kauffman v. TTC Case Mrs. Kauffman was exiting a TTC station. She was going up an escalator, and the escalator had metal hand rails, not rubber ones. Some young fellows ahead of her started to fight,...
-
Federal law explains a federal court's ability to review a denied Medicare claim, and how it is significantly limited by statute. Congress constrains a Court's power to overrule what the...
-
Vastine Medical, Inc., is considering replacing its existing computer system, which was purchased years ago at a cost of . The system can be sold today for . It is being depreciated using MACRS and a...
-
A 2500-lbm car moving at 15 mi/h is accelerated at a constant rate of 15 ft/s 2 up to a speed of 50 mi/h. Calculate force and total time required?
-
Determine the minimum number of workers needed, and a schedule for the following staffing requirements, giving workers two consecutive days off per cycle (not includingSunday). Day Mon...
-
What is the kanban aspect of JIT?
-
Why might it be inappropriate to use inventory turnover ratio s to compare inventory performance of companies that are in different industries?
-
The lathe post not provided with power feed is (a) lead screw (b) carriage (c) compound rest (d) cross slide
-
A cone shaped recess at the top of drilled hole can be made by (a) countersinking (b) counterboring (c) taper drilling (d) grooing.
-
Power feed is not provided on the following drilling machine : (a) bench drill press (b) gang drilling machine (c) radial drilling machine (d) all of the above.
Study smarter with the SolutionInn App