Question: An X-bar R chart was prepared for an operation using twenty samples with 5 pieces in each sample. X-bar-bar was found to be 33.6and R=bar

An X-bar R chart was prepared for an operation using twenty samples with 5 pieces in each sample. X-bar-bar was found to be 33.6and R=bar was 6.2. During production a sample of 5 was taken and the pieces measured 36, 43, 37, 25, and 38. At the time this sample was taken: Circle the correct answer:

  1. Both average and range were within control limits
  2. Neither average nor range were within control limits
  3. Only the average was outside control limits
  4. Only the range was outside control limits

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!