Question: An X - bar and R chart was prepared for an operation using twenty samples with five pieces in each sample. X - bar was
An Xbar and R chart was prepared for an operation using twenty samples with five pieces in each sample. Xbar was found to be and Rbar was During production a sample of five was taken and the pieces measured and At the time this sample was taken:
Group of answer choices
both average and range were within control limits
neither average nor range were within control limits
only the average was outside control limits
only the range was outside control limits
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
