Question: answer 5.2 Q5.2 (Simple Setup) Consider the following batch flow process consisting of three process steps performed by three machines: Batch of 50 B B

answer 5.2
answer 5.2 Q5.2 (Simple Setup) Consider the
Q5.2 (Simple Setup) Consider the following batch flow process consisting of three process steps performed by three machines: Batch of 50 B B C5+ Bxp Step 1 Step 2 Step 3 FR.SU 1 30e.hr 1-30/ /60 - 20 Activity Time: Activity Time: Activity Time: 1 Minute/Part 100 2 Minutes/Part 1.5 Minutes/Part Setup Time: 20 No Setup No Setup 20 Minutes 20 100 42,86 The 30/1 40/hr Work is processed in batches at each step. Before a batch is processed at step 1, the ma- chine has to be set up. During a setup, the machine is unable to process any product. 2. Assume that the batch size is 50 parts. What is the capacity of the process? d. For a batch size of 10 parts, which step is the bottleneck for the process? c. Using the current production batch size of 50 parts, how long would it take to produce 20 parts starting with an empty system? Assume that the units in the batch have to stay together (no smaller transfer batches allowed) when transferred to step 2 and to step 3. A unit can leave the system the moment it is completed at step 3. Assume step 1 needs to be set up before the beginning of production d. Using the current production batch size of 50 parts, how long would it take to pro- duce 20 parts starting with an empty system? Assume that the units in the batch do not have to stay together, specifically, units are transferred to the next step the mo- ment they are completed at any step. Assume step I needs to be set up before the be- ginning of production e. What batch size would you choose, assuming that all units of a batch stay together for the entire process? (indicates that the solution is at the end of the book) Batch of 2o 30/h 30/hr 40/h

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!