Question: answer question 3 Q3 The snapback method was used in time study for a worker-machine cycle consisting of three elements: D, E, and F as

answer question 3 Q3 The snapback method was used

answer question 3

Q3 The snapback method was used in time study for a worker-machine cycle consisting of three elements: D, E, and F as shown in Table 2. Elements and E are worker-controlled and were performance rated at 100% for element D and 90% for element E during the time study. Element F is machine-controlled. Elements E and F are performed simultaneously. The Personal, Fatigue and Delay (PFD) allowance is 14% and the machine allowance is 10%. One work piece is produced each cycle. Analyze the quantity in pieces that can be produced if the worker works 7 hours and 30 minutes during an 8-hour shift. (10 marks) Table 2: Observation Time Element D E Observed time (minute) 3.00 1.76 F 1.50

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!