Question: The snapback method was used to time study a worker-machine cycle consisting of three elements: a, b, and c. Elements a and b are worker-controlled

The snapback method was used to time study a

The snapback method was used to time study a worker-machine cycle consisting of three elements: a, b, and c. Elements a and b are worker-controlled and were performance rated at 100% during the time study. Element cis machine-controlled. Elements b and care performed simultaneously. The PFD allowance = 12% and the machine allowance = 10%. One work piece is produced each cycle. Determine (a) the normal time and (b) standard time for the cycle. (c) If the worker works 7 hours and 10 min during an 8-hour shift, and his performance level is 135%, how many pieces are completed? b C Element Observed time (min) 1.25 0.90 0.80

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!