Question: Answer using Excel (show work)*** Sampling four pieces of precision-cut wire (to be used in computer assembly) every hour for the past 24 hours has

Answer using Excel (show work)***
Sampling four pieces of precision-cut wire (to be used in computer assembly) every hour for the past 24 hours has produced the following results: HOUR R HOUR R X 1 3.25" 0.70 13 3.22" 1.94 2 3.10 0.55 14 2.90 1.71 3 3.22 0.01 15 3.12 0.86 4 3.79 1.18 16 3.43 1.79 5 3.07 1.74 17 2.74 1.71 6 2.36 0.24 18 2.58 1.82 7 3.05 0.21 19 3.18 2.54 8 3.02 1.38 20 3.00 1.06 9 2.85 2.46 21 2.98 1.32 10 2.92 0.93 22 4.21 1.47 11 2.58 1.27 23 3.24 1.92 12 3.06 1.13 24 2.72 2.88 A. (3 points) What is the value of x? What is the value of R? B. (2 points) What are the UCLx and LCLX, using 30? C. (2 points) What are the UCLR and LCLR, using 30? D. (5 points) If the true diameter mean should be 3" and you want this as your center (nominal) line, what are the new UCLx and LCLXStep by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
