Question: answers in the spaces provided and include a calculation page for my reference. Student Name: Student Number: ( abc - def - ghi ) 1

answers in the spaces provided and include a calculation page for my reference.
Student Name:
Student Number: (abc-def-ghi)
15.im
Former Ground surface
Question #1: An 8m deep excavation is advanced via dredging into a layer of clay that overlays a layer of sand. A well, installed and screened in the sand just below the clay, indicates a hydraulic head of 15.im above the sand/clay interface. While dewatering the excavation the clay layer heaves. Determine the depth of the water in the excavation at the time of the heave.
Questions #2: Referring to the flownet sketch provided determine the flow (Q) and pore water pressures (U). Place all answers in the space provided and submit a separate calculation page supporting your answers.
Nt
\table[[Point,Depthz((cm)),PressureHeadhp((cm)),PressureU(Pq)
answers in the spaces provided and include a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!