Question: 8 . 9 Based on the scraper specifications in Table 8 . 1 and the performance charts in Figures 8 . 8 and 8 .
Based on the scraper specifications in Table and the performance charts in Figures and and for haul conditions as stated here, analyze the probable scraper production. How many scrapers should be used and what will be the production in bcy per hour? The material to be hauled is cohesive. It has a swell factor of and a unit weight of The expected rolling resistance for the wellmaintained haul road is Assume a min load time and that average load will be of heaped capacity. To account for both acceleration and deceleration, use an averase speed of over a distance of Use a min hour efficiency factor. The total length of haul is and has the following individual segments when moving from cut to fill:
grade
grade
grade
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock