Question: Apply the shifting bottleneck heuristic for the makespan objective in the following instance of the job shop problem. a) Show the routing constraints on a
Apply the shifting bottleneck heuristic for the makespan objective in the following instance of the job shop problem. a) Show the routing constraints on a network diagram. (S points) b) Produce the first feasible schedule by the shifting bottleneck heuristic. Clearly show your work in each step of the algorithm. ( 30 points)