Question: 3. Apply the shifting bottleneck heuristic for the makespan objective in the following instance of the job shop problem. a) Show the routing constraints on

 3. Apply the shifting bottleneck heuristic for the makespan objective in

3. Apply the shifting bottleneck heuristic for the makespan objective in the following instance of the job shop problem. a) Show the routing constraints on a network diagram. (5 points) b) Produce the first feasible schedule by the shifting bottleneck heuristic. Clearly show your work in each step of the algorithm. ( 30 points)