Question: As a project manager, you are considering using either the risk driver method of project cost risk analysis or the traditional 3-point cost analysis on

As a project manager, you are considering using either the risk driver method of project cost risk analysis or the traditional 3-point cost analysis on your latest project.

  • Write a paper with a minimum of 8 pages comparing and contrasting the steps of the traditional 3-point cost analysis method and the risk driver method.
  • provide a specific example that determines total project cost with 4 cost elements using the 3-point cost analysis method.
  • Show each step of the process and the associated tables to depict the data.
  • Your paper should do the following:
    • Fully define and describe the steps of the risk driver method and the 3-point method.
    • Compare and contrast each method giving pros and cons.
    • Develop sample project cost estimate using a spreadsheet as well as discuss contingencies.
    • Include a table with the following data to support your example:
      • Project cost element table with associated 3-point estimates, mean, and variances.
      • Total project standard deviation and total project mean.
    • Discuss how to prioritize risks to cost, risk mitigation and schedule.
    • Cumulative probability distribution (10%-90%) table for the total project cost.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!