Question: As a project manager, you are considering using either the risk driver method of project cost risk analysis or the traditional 3-point cost analysis on
As a project manager, you are considering using either the risk driver method of project cost risk analysis or the traditional 3-point cost analysis on your latest project.
- What is a specific example that determines total project cost with 4 cost elements using the 3-point cost analysis method?
- What is each step of the process and the associated tables to depict the data?
- Project cost element table with associated 3-point estimates, mean, and variances.
- Total project standard deviation and total project mean.
- Cumulative probability distribution (10%-90%) table for the total project cost.