Question: As a quality engineer, you're about to explain to management that the process being checked is stable and the capability indices are Cp = 1

As a quality engineer, you're about to explain to management that the process being checked is stable and the capability indices are Cp=1.5 and Cpk=0.75, which of the following can be concluded from the information given. Check all the correct statements (only 4 are correct):
A.
The process is capable and on target
B.
The specification tolerance (USL-LSL) is twice as large as the process spread of six standard deviations.
C.
If the specification tolerance is known, we can determine the standard deviation
D.
The process can be made capable if the average can be shifted to target
E.
The process is showing out of control conditions over time
F.
The process is producing units that are outside the specification limits
G.
The process is in control

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!