Question: As the group creates the Operations Manual presentation it will build a list of assumptions and constraints. Assumptions are circumstances and events that need to
As the group creates the Operations Manual presentation it will build a list of assumptions and constraints. Assumptions are circumstances and events that need to occur for the project to be successful but are outside the total control of the project group. Assumptions are accepted as true and are often without proof or demonstration. Constraints are things that might restrict, limit, or regulate the project. Generally, constraints are outside the total control of the project group