Question: asking for part B me Macon Controls produces three different types of control units used to protect industrial equipment from overheating Each of these units

asking for part B me Macon Controls produces
asking for part B me Macon Controls producesasking for part B
me Macon Controls produces three different types of control units used to protect industrial equipment from overheating Each of these units must be processed by a machine that Macon considers to be their process bottleneck. The plant operates on two 8-hour shifts, 5 days per week 52 weeks per year. The table below provides the time standards at the bottleneck, lot sizes, and demand forecasts for the three units. Because of demand uncertainties, the operations manager obtained three demand forecasts (pessimistic, expected, and optimistic). The manager bolleves that a 20 percent capacity cushion is best 60 Time Standard Demand Forecast Component Processing Setup Lot Size (hrlunit) thr/lot) (units/lot) Pessimistic Expected Optimistic 0.05 1.0 50 14,000 17,000 25,000 0.30 4.4 80 10,000 13,000 17,000 C 0.05 8.5 120 16,000 24,000 40,000 b. How many machines are required if the operations manager decides to double lot sizes? (Enter your responses rounded up to the next whole number) Demand Forecast Capacity Requirement (M) Pessimistic machines Expected machines Optimistic machines Spring

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!