Question: Component Processing Problem 7 Macon Controls produces three different types of control units used to protect industrial equipment from overheating. Each of these units must

Component Processing Problem 7 Macon Controls
Component Processing Problem 7 Macon Controls
Component Processing Problem 7 Macon Controls produces three different types of control units used to protect industrial equipment from overheating. Each of these units must be processed by a machine that Macon considers to be the proces on two B-hour shifts, 5 days per week 52 weeks per year. The table below provides the time standards at the bottleneck lot sizes, and demand forecast for the three units. Because of demand uncertaines, the three demand forecasts (pessimistic expected, and optimistic). The manager believes that a 25 percent capacity cushion is best D Time Standard Demand Forecast Setup Lot Site Thrunit Pessimistic thello) (unit) Expected Optimistic 0.04 10 50 16.000 15,000 25.000 4.1 75 9.000 13,000 18,000 C 0.05 8.5 100 18.000 24.000 37.000 2. How many machines are required to meet etsintrum (Pessimit) Comend axpected demand, and maximum Optimistic) comand? (Enter your reports rounded up to the next whole number Demand Forecast Requirement (M Capacity Pos machine Expected machines Optimiste machines 0.30 Enter your brower in the edit fields and then click Check Answer. 3 parts emaining CA MacBook Pro SC Ho 5: 3 $ 4 UR & 7 1 2 3 6 8 Q W E R T Y Question Help industrialement from overheating. Each of these units must be processed by a machine that Macon considers to be their process bottleneck. The plant operates vides the time standards at the bottleneck, lotes, and demand forecasts for the three units. Because of demand uncertainties, the operations manager cotained believes that a 25 percent capacity Cushion is best 16.000 Time Standard Demand Forecast mponent Processing Setup Lot Size Ihrunit) Pessimistie Expected Optimistic Throt) (units/lot) 004 10 10.000 25030 0.30 75 9,000 13.000 18.000 0.05 8.5 100 18.000 24,000 37.000 - expected demand, and maximum (Optimistic demand? (Enter your anses rounded up to the next whole number) Capacity Durand Forecast Requirement (M) Pessimistic Expected Optimistic machines machines machines CA Check MacBook Pro

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!