Question: Assembly line involving 6 workstations how to balance work load Station 1 : 3 elements 4 5 seconds, B , D;E must be done after

Assembly line involving 6 workstations how to balance work load
Station 1: 3 elements 45 seconds, B,D;E must be done after A in any order It is possible to share H between 2&4 cycle time increase 1sec. But totalwork content reuced by 30sec
 Assembly line involving 6 workstations how to balance work load Station