Question: Assign the weights to each feasibility based on the importance of each feasibility related to the problem.. Think about 3 possible systems (solutions to the
Assign the weights to each feasibility based on the importance of each feasibility related to the problem..
Think about 3 possible systems (solutions to the problem).
Evaluate these systems using the feasibility matrix.
| Feasibility Matrix | ||||
| Criteria | Weight | Candidate System1 | Candidate System2 | Candidate System3 |
| Operational Feasibility: An assessment of how well the solution meets the identified system requirements to solve the problems and take advantage of the opportunities envisioned for the system. | 30% | |||
| Technical Feasibilty:An assessment of the practicality of the solution and the availability of technical resources and expertise to implement and maintain it. | 30% | |||
| Economic Feasibility: An assessment of the cost-effectiveness of a project or solution | 20% | |||
| Schedule Feasibility: An assessment of how long the solution will take to design and implement. | 20% | |||
| Weighted Scores | 100% | 0.0% |
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
