Question: Assignment Tasks A 3 d View and a plan is shown in figure 1 a and figure 1 b of a G + 1 5

Assignment Tasks
A 3d View and a plan is shown in figure 1a and figure 1b of a G+15 building respectively. The weight density of the wall could be taken as 20kNm3. and that of concrete could be taken as 25kNm3. The live load details acting on the slab have been provided in the excel sheet. Analyze the beam ABCD, APQRS, UVWXT after ''% moment redistribution. Draw the bending moment diagram before and after
MEC_AMO_TEM_035_04
Page 1 of 14
Advanced Structural Design (CIVL 0054)- Spring 24- CW1(Assignment 1)-B-QP
moment redistribution.(Students are supposed to analyze only one continuous beam-kindly check the excel sheet)
Figure 1a.3D view of a Multistory building
Advanced Structural Design (CIVL 0054)- Spring 24- CW1(Assignment 1)-B-QP
Figure 1b. Plan view of a Multi storey building
Established in 1995, Al Musawwir Structural Engineers quickly became a leading firm in Muscat's structural engineering scene. Starting with homes and shops, the company earned praise for its sturdy designs, crafted to handle Oman's unique weather and terrain. As time passed, Al Musawwir took on bigger projects, like famous buildings, tall towers, bridges, and factories. They're known for their smart solutions and embracing new technology, always staying ahead by working closely with schools and researchers. As Muscat grew, so did Al Musawwir, spreading their expertise across the Gulf and beyond. Today, they're respected worldwide for their clever designs and green practices. The company has been awarded with a commercial building project. The commercial building is envisioned as a modern and vibrant hub for commerce, offering a mix of retail spaces, offices, dining establishments, and leisure amenities. Situated in a prime location within Muscat's central business district, the building's design reflects the city's dynamic urban character while providing functional and inviting spaces for tenants and visitors alike. Total budget of the proposed 20 Million OMR.
Assignment Tasks A 3 d View and a plan is shown

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!