Question: Assuming a conservative value for an overflow rate, design several parallel circular sedimentation basins that together must handle a design peak daily flow of 0
Assuming a conservative value for an overflow rate, design several parallel circular sedimentation basins that together must handle a "design" peak daily flow of of Alum floc to remove turbidity.
a Use Table Qasim and in the lecture notes to select an overflow rate. Conservative means the value that gives you a design that will not fail for all parameter values if you have a range of possible values
b Select the number of basins you feel is reasonable. Justify your answer in a few sentences. You may want to perform several iterative calculations.
c Determine the diameter of each basin select the diameter from standard increments of
d Determine the sidewater depth of the basin so there is at least hours of detention time and the basin depth is at least Note, you can design a deeper basin if you decide it is merited. Justify if you do this.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
