Question: At first, I need same content with less than 20% plagiarism. Work Breakdown Structure. Second Work Breakdown Structure Dictionary--I attached template for WBS dictionary, work

At first, I need same content with less than 20% plagiarism. Work Breakdown Structure.

Second Work Breakdown Structure Dictionary--I attached template for WBS dictionary, work title and description

At first, I need same content with less than 20%
\fLevel One 1. Agreement Level Two 1.1 Documents agreement 1.2 Shop drawing 1.3 Project requirements 1.4 Architectural Plan 1.5 Required Budget 2.1Document review 2. Revised Documents 2.2 Document approval 3.1 Contract Documentation 3. Bids and Contracts 3.2 Bids 4. Grading and Building Permits 4.1 File Grading Permit Application 4.2 File Building Permit Application 4.3 Post Lot Identification 4.4 Install Construction Entrance 4.5 Install Sediment Controls 4.6 Sediment Control Inspection 4.7 Grading Permit Issued 4.8 Country Permit Process 4.9 Building Permit Approved 4.10 Pay Permit Fee and Taxes 4.11 Building Permit Issued 5.1 Initial Construction Plan 5.2 Architectural Design 5. Designing Process 5.3 Designing Landscaping and Sites 5.4 Developing Architectural Design 5.4 Developing Architectural Design 5.5 Developing Landscaping and Sites Design 6.1 Prepare Site Work 6.2 Site Excavation 6.4 Basement Construction 6.5 Upper Level Construction 6.6 Wood Framing 6. Construction Processes 6.7 Wall Framing Columns 6.8 Insulation 6.9 Sheathing 6.10 Utilities Instillation 6.11 Gypsum Board Installation 6.12 Interior Works 6.13 Exterior Works 7.1 Construction Inspection 7.2 Electrical Inspection 7. Project Inspections 7.3 Plumbing Inspection 7.4 Certificate Of Occupancy 8.1 Cleaning from Construction Waste 8. Cleaning Up 8.2 Ready To Move In 9. Closing Project 9.1 Project Completed Level Three Level Four 2.1.1 Final Plan Review 2.1.2 Final Specification Review 2.1.3 Review Site Plan 2.1.4 Construction Plans Printing 2.2.1 Approve Revised Plans 2.2.2 Approve Revised Specifications 2.2.3 Approve Revised Site Plan 3.1.1 Make Copy of Plans 3.1.2 Make Copies of Specifications 3.1.3 Distribute Plans and Specifications 3.2.1 Receive Bids 3.2.2 Review bids 3.2.3 Approve Subcontractor Agreements 5.1.1 Overall Area Divisions 5.1.1.1 Assign Location for Each Site 5.2.1 Floor Plan 5.2.1.1 Floors Layout 5.2.1.2 Units Design/Floor Plan 5.3.1 Amenities and Sites Floor Plan 5.3.1.1 Pool Design 5.3.1.2 Parking Structure 5.3.1.3 Common Park Layout 5.3.1.4 Recreation Center 5.3.1.5 Sport Activities Courts 5.4.1 Final Floor Plan Approval 5.4.1 Final Floor Plan Approval 5.5.1 Final Structure and Distribution Approval 6.1.1 Site Clearing and Ground Breaking 6.1.1.1 Cut Trees/ Vegetation 6.1.1.2 Clearing Debris 6.1.1.3 Stock Soil 6.1.1.4 Leveling the Ground 6.2.1 Designate Area/ Site Layout 6.2.2 Start Excavation Process 6.4.1 Basement Forming 6.4.1.1 Place Form Work for the Basement 6.4.1.2 Place Vapor Retarders 6.4.2 Pour Concrete 6.4.2.1 Level the Concrete Slab 6.5.1 Parking Lot Construction 6.5.1.1 Place Form Work for Pillars 6.5.1.2 Install Reinforcement 6.5.1.3 Pour Conctete 6.5.1.4 Curing and Sealing 6.5.1.5 Level the Concrete Slab 6.5.1.6 Remove the Form Work 6.5.2 First Floor Construction 6.5.2.1 Place Form Work for Pillars 6.5.2.2 Install Reinforcement 6.5.2.3 Pour Concrete 6.5.2.4 Curing and Sealing 6.5.2.5 Level the Concrete Slab 6.5.2.6 Remove the Form Work 6.6.1 Exterior Walls Wood Framing 6.6.1.1 Install 2*6 studs 6.6.1.2 Install 2*6 headers 6.6.1.3 Install 2*8 headers 6.6.1.4 Install 2*6 plates 6.6.2 Interior Walls Wood Framing 6.6.2.1 Install 2*4 studs 6.6.2.2 Install 2*12 headers 6.7.1 Columns 4*6 6.7.2 Columns 6*6 6.8.1 Building Insulation above Ceiling 6.8.2 Building Insulation in Exterior Walls 6.8.3 Building Insulation in Interior Walls 6.9.1 Sheathing plywood for exterior walls 6.9.2 Sheathing plywood for interior walls 6.10.1 Install Plumbing 6.10.2 Install Electrical 6.10.3 Install HVAC 6.11.1 Gypsum Board-Drywall for Ceiling 6.11.2 Gypsum Board-Drywall for Walls 6.12.1 Install Exterior Doors 6.12.2 Install Interior Doors 6.12.3 Install Windows 6.12.4 Install Carpet 6.12.5 Install Ceramic Tiles 6.12.6 Custom Cabinets for Kitchen 6.12.7 Custom Cabinets for Bathroom 6.12.8 Custom Cabinets for Laundry Room 6.12.9 Painting 6.12.10 Install Resilient Tiles 6.12.11 Install Fire Place 6.12.12 Install Plumbing Fixtures in Kitchen 6.12.13 Install Plumbing Fixtures in Bathroom 6.12.14 Install Plumbing Fixtures in Laundry Room 6.13.1 Install Gutters 6.13.2 Painting Exterior Walls 6.13.3 Fixing Rails for Patio 6.13.4 Construction of Parapet Wall 7.1.1 Inspect 7.1.2 Construction Pass 7.1.3 Inspection Completion 7.2.1 Inspect 7.2.2 Codes Pass 7.2.3 Inspection Completion 7.3.1 Inspect 7.3.2 Pluming Pass 7.3.3 Inspection Completion 7.4.1 Approval to Occupy the Building Units Level Five 6.4.1.1.1 Place reinforcement 6.5.1.1.1 Place Form Work for the Upper Level 6.5.1.1.2 Place Reinforcement 6.5.1.1.3 Pour Concrete 6.5.1.1.4 Curing and Sealing 6.5.1.1.5 Level the Concrete Slab 6.5.1.1.6 Remove the Form Work 6.5.2.1.1 Place Form Work for the Upper Level 6.5.2.1.2 Place Reinforcement 6.5.2.1.3 Pour Concrete 6.5.2.1.4 Curing and Sealing 6.5.2.1.5 Level the Concrete Slab 6.5.2.1.6 Remove the Form Work \f\f\f\f\f\f\f

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!