Question: B 2.5 5 7 8 Using the following project information, calculate the variance for each of the project activities. Optimistic Time Most Likely Time Pessimistic

B 2.5 5 7 8 Using the following project
B 2.5 5 7 8 Using the following project
B 2.5 5 7 8 Using the following project information, calculate the variance for each of the project activities. Optimistic Time Most Likely Time Pessimistic Time Immediate Activity Estimate(weeks) Estimates (weeks) Estimates (weeks) Predecessor(s) A 2 3 5 none 4 5 A 3 7 B,C 13 B,C 5 6 E F 12 5