Question: b) An assembly work consisting of two sequential job elements has been studied using a stopwatch approach. The observed times for the job elements are

b) An assembly work consisting of two sequential

b) An assembly work consisting of two sequential job elements has been studied using a stopwatch approach. The observed times for the job elements are shown in Table 2. Determine the standard time for the assembly work, with the assumption of a combined personal delay and fatigue of 20%. (5 marks) Table 2 + Job Observation (minutes) Performance element 2 3 4 5 6 rating (%) A 0.15 0.21 0.18 0.19 0.21 0.17 90 B 0.54 0.55 0.57 0.62 0.49 0.46 100 0.33 0.31 0.32 0.75 0.30 0.30 85