Question: b . Change the price ( c e l l D 8 ) t o achieve the goal. 8 . Tech Togs i s designing

b. Change the price (cellD8)to achieve the goal.
8. Tech Togs is designing a new smart watch named Zurich and plans to work with three vendors to manufacture the watch. Akio wants to know how to minimize the total manufacturing cost.
Switch to the Zurich worksheet. Run Solver to solve this problem as follows:
a. Set the objective to minimize the total manufacturing cost (cellE12).
b. Use the units produced by each vendor (the range B11:D11)as the changing variable cells.
c. Adjust the total manufacturing cost by each vendor using the constraints in Table 2.
d. Run Solver, keep the solution, and then return to the Solver Parameters dialog box. Make unconstrained variables non-negative and use GRG Nonlinear as the solving method. Save the model beginning in cell D16.
Max
Min
Value Of:
By Changing Variable Cells:
$B$11:$D$11
Subject to the Constraints:
[ $B$11:$D$11= integer ],[ $B$11:$D$11 $B$16],[ElNidoUnits $B$19],[GansuUnits = $B$17],[QStarUnits = $B$18],[TotalUnits = $B$20]
Add
Change
Delete
Reset All
LoadSave
Make Unconstrained Variables Non-Negative
Select a Solving
GRG Nonlinear
Method:
Solving Method
Select the GRG Nonlinear engine for Solver Problems that are smooth nonlinear. Select the LP Simplex engine for
linear Solver Problems, and select the Evolut
PLease tell me what I am doing wrong
b . Change the price ( c e l l D 8 ) t o achieve

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!