Question: (b) For 10 consecutive days, a process engineer has measured the temperature of water bottles as they are made ready for serving. Each day, she

(b) For 10 consecutive days, a process engineer

(b) For 10 consecutive days, a process engineer has measured the temperature of water bottles as they are made ready for serving. Each day, she took a sample of 9 bottles. The average across all 90 bottles (10 days, 9 bottles per day) was 45 degrees Fahrenheit. The standard deviation across all bottles was 1.8 degree. When constructing an X-bar chart, what would be the center line, upper control limit and lower control limit (30/100 pts)