Question: b) For the forecast develeged using exponential smooting (a =0.60 and intal forecais 10.0), the MAD : 5abst (round your fesponse co two decimas phaces)



b) For the forecast develeged using exponential smooting (a =0.60 and intal forecais 10.0), the MAD : 5abst (round your fesponse co two decimas phaces) c) For the forecast developed using exponentiai smoothng (0=0.60 and inital forecast 19.0), the backing signal = (round your response to two decimal places). Caiculate (a) MAD and (b) MSE for the following forecast versus actual sales figures: a) MAD= (round your response to one decimal piace). b) MSE = (round your response to one decimal place). Using PERr, Adam Munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 16 a) The probabity that the project will be completed in 5 months = (round your response to four decimal places). b) The probabilty that the project wal be completed in 20 months (round your response to four decimal places). e) The probabily that the project will be completed in 25 manths : (round your response to tour decimal places). d) The probabiliy that the project wit be complesed in 37 months = (round your response to foir decimal places) 0) The die date that yields a 95% chance of completion / months (round your response to hvo decima pusces). The number of intemal disk drives (in milions) made at a plant in Taiwan during the past 5 years follows: a) Using simple lineat reqression, the forecast for the number of disk drives to be made next year = disk drives (round your rosponse to one decimal place). b) The mean squared ertor (MSE) When using simple linear regression = drives? (round your response to one decimal place) c) The mean absolute percentage error (MAPE) when using simple Inear regression = 16 (round your response fo one decimal place)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts