Question: Background. You are excavating a 1 0 0 ft long 4 f t wide x 1 0 ft deep utility trench. The soil is a

Background. You are excavating a 100 ft long 4ft wide x10 ft deep utility trench. The soil is a cohesive silty loam with an unconfined compressive strength qu =2 ksf. You plan to use shoring constructed of upright sheeting and hydraulic bracing as shown. The hydrautic cylinders are 5 feet apart horizontally. Your company already owns the shoring material. You estimate that it will cost $225 in labor to install it
a. What volume of excavation is required for the shored solution?
b. What volume of excavation is required for the sloped solution?
c. The cost for excavation, backfill and compaction is $2.50? bcy: Is it cheaper to install shoring or to slope the excavation (disregard time impacts)?
Background. You are excavating a 1 0 0 ft long 4

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!