Question: Background. You are excavating a 1 0 0 ft long 4 f t wide x 1 0 ft deep utility trench. The soil is a
Background. You are excavating a ft long wide x ft deep utility trench. The soil is a cohesive silty loam with an unconfined compressive strength qu ksf You plan to use shoring constructed of upright sheeting and hydraulic bracing as shown. The hydrautic cylinders are feet apart horizontally. Your company already owns the shoring material. You estimate that it will cost $ in labor to install it
a What volume of excavation is required for the shored solution?
b What volume of excavation is required for the sloped solution?
c The cost for excavation, backfill and compaction is $ bcy: Is it cheaper to install shoring or to slope the excavation disregard time impacts
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
