Question: Below are 8 tasks in a system with the units per hour listed for each task. Assuming output can begin at task A or task

Below are 8 tasks in a system with the units per hour listed for each task. Assuming output can begin at task A or task C and these are simultaneous tasks, while final output only need move through one of the F tasks as these are exactly the same, or parallel tasks; what is the thoroughput of the system? U = Units per hour F-.5U B-5U A-30 E-200 F-.5U D-6U F-.50 C-5U 145 minutes 263 minutes O 385 minutes 503 minutes