Question: Below is an activity network with times ( in weeks ) shown above each node: A 5 weeks leads to B 6 weeks and C

Below is an activity network with times (in weeks) shown above each node:
A 5 weeks leads to B 6 weeks and C 7 weeks. B to d 3 weeks. D to G 5 weeks. C to E 5 weeks. E to H 4 weeks.
Which of the following statements is FALSE?