Bernold (2010) identified a framework for categorizing Labour Hours Spent in an Engineering Project as shown below. Which of the following categories should be minimized in order to increase the labor efficiency? (One or two or three choices) (1 point) Select by bolding the correct answer(s).

a. Value-Adding Work Time b. Contributory Work Time c. Ineffective Work Time d. Unproductive Work Time e. Personal Time