Question: Borrow pit volume question ( 2 0 points ) A bor row pit levelling survey was conducted in 5 0 3 0 m area and
Borrow pit volume question points
A bor row pit levelling survey was conducted in area and yielded the following IFS readings in m as shown in Figure The area was subdivided into grids using measuring tape. Each grid has a size of The soil in the borrow pit will be cut and will be used for road bed.
a Determine the elevations of the corner of the grids if elevation is and the backsight at is Tabulate the data.
b If only the area inside the boundary dashed line as shown in Figure to be cut up to MSL what is the total cut volume in available for the bounded area?
c After excavation of soil in b the soil is being stockpiled before being trucked and then compacted at the road project site. The soil has a swell of and a shrinkage of What is the volume of the stockpiled soil, and the compacted soil?
d Assuming there is no further swelling of soil when being trucked from the stockpile to the proposed road bed, determine the number of trucks required to haul the soil if dump trucks have capacity of
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock