A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). 2.4 units/hr 1.8 units/hr Sanding Assembly 0.7 units/hr Sawing Welding Assembly 0.7 units/hr 5 units/hr Drilling 5 units/hr Assembly 0.7 units/hr is the bottleneckStep by Step Solution