Question: (c) Messy Industrial Ltd. allocates multiple products to its machining and assembly processes in two different areas inside its factory. To utilize the machines, the
(c) Messy Industrial Ltd. allocates multiple products to its machining and assembly processes in two different areas inside its factory. To utilize the machines, the company used Forward scheduling. The machining processes involve several types of machines, each with different capacities and operator skills. It is required to have temporary storage in the area to hold inventories before quantity of total lots have been completed. A completed lot would then be transported on pallets to the assembly processes area. With reference to the JIT and Lean concepts, identify E.Q!lR major wastes or problems in Messy Industrial Ltd. with brief justification for each. Briefly describe QNE practice or technique to rectify EACH waste or problem. Your answer should not repeat practices or techniques already used for another waste or problem.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
