Question: Can someone help me construct this. All paths start at 1, not 0. Network Analysis Problem #3 0 4 Problem #3: The table below was

Can someone help me construct this. All paths start at 1, not 0.

Can someone help me construct this. All paths

Can someone help me construct this. All paths

Can someone help me construct this. All pathsCan someone help me construct this. All pathsCan someone help me construct this. All paths

Network Analysis Problem #3 0 4 Problem #3: The table below was prepared at the beginning of an system implementation project. The project begins with two activities: Assemble project team (A) and Budget resources (B). Note that the table lists the duration of each activity in days, and also provides the predecessors for each activity. a) Draw the high-level Network Diagram (6 pts.) | Activity | Preceding Planned Du- b) What is the Critical Path? (2 points) Activity ration (days) c) Draw the Network Diagram including the Start --- Network Nodes (10 points) Start d) Which activities NOT on the Critical Path Start should be monitored most closely? (2 points) A e) When do you expect this project to be A finished? (2 points) B f) At the end of the first week, it was noted that B 1 activity A was completed in 2.5 days, but IDE activity B required 4.5 days. What impact F 5 does this have on the project? Are the same C 2 activities critical? Which activities should be J GH T1 monitored closely? (6 points) End g) Draw the revised Network Diagram including the Network Nodes. (10 pts.) I, J 3/31/2020 NW Analysis Extra-Credit Network Analysis Problem #3 - Solution Problem #3: a) Draw the high-level Network Diagram (6 points) - Ad A 4 Finish Start B3 3/31/2020 NW Analysis Extra-Credit Network Analysis Problem #3 - Solution: continued + + b) What is the critical path? (2 points) Path _ =_ _+_ = __ days Path _+_ = __ days Critical Path??? Path = _+ _+_ = __ days Path _= __ days + + + + + + + c) See next slide for Network Diagram with full Network Nodes d) Which activities NOT on the critical path should be monitored most closely? (2 points) __ and __ because they only have ___ days of float before impacting the Critical Path. Note: the tasks with the least float have the highest schedule risk see the completed Network Diagram on the next slide e) When do you expect this project to be finished? (2 pts.) _days 3/31/2020 NW Analysis Extra-Credit Network Analysis Problem #3 - Solution: continued f) At the end of the first day, it was noted that activity A was completed in 2.5 days, but activity B required 4.5 days. What impact does this have on the project? (2 points) Are the same activities critical? (2 points) Which activities should be monitored closely? (2 points) Note: you must draw the Revised Network Diagram on the next slide to answer these questions (on next slide) + + + + + + Path Path Path Path days __days Monitor Closely ??? _days New Critical Path ??? days Monitor Closely ??? + + = _=_ + + + __+_= + Critical Path changes from_ to____ (paths) Activities __, and __ should be monitored closely, since they each have have only _ week(s) of float See revised Network Diagram on the next slide 3/31/2020 NW Analysis Extra-Credit Network Analysis Problem #3 - Solution: continued g) Revised Network Diagram (10 points) 1 2.5 2.5 A (completed) 1 1 3.5 Start End 1 4.5 4.5 B (completed) 1 0 4.5 Critical Path shown with Red arrows 3/31/2020 NW Analysis Extra-Credit

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!