Question: Can someone show me how to do steps 21, 22 and 23 using excel. Attach is the problem and the excel. Having trouble figuring out
Paragraph the Limitations section of the spreadsheet model to set a constraint for raw materials. Use 21 4.000 4.000 a constraint for maximum production capablity. Use cel references to set 4.000 23 pdated 10/02/2017 Current.Instruction docx Office 2016-myitlab:grader-Instructions Excel Project Points Step Instructions Solve the oroblem,. Generate the Answer Report and Keep Solver Salution. 24 5.000 Paragraph the Limitations section of the spreadsheet model to set a constraint for raw materials. Use 21 4.000 4.000 a constraint for maximum production capablity. Use cel references to set 4.000 23 pdated 10/02/2017 Current.Instruction docx Office 2016-myitlab:grader-Instructions Excel Project Points Step Instructions Solve the oroblem,. Generate the Answer Report and Keep Solver Salution. 24 5.000