Question: Case Study Managing a Merger at Lightning Networks After receiving regulatory approval from the European Union, Lightning Networks, a major wireless carrier, and SatTV, the

Case Study Managing a Merger at Lightning Networks

After receiving regulatory approval from the European Union, Lightning Networks, a major wireless carrier, and SatTV, the largest satellite TV provider in Europe, completed their 50 billion euro merger in 2016. After initial skepticism when the deal was first announced, analysts had warmed to the idea of synergies in the merger. Lightning expected to benefit from the large customer base of SatTV and the company announced that it expected significant annual cost savings within three years of the merger. Simone Durand, senior VP of supply chain at Lightning, was charged with identifying some cost reduction opportunities. She decided to focus her initial attention on the distribution networks the two companies used to fulfill demand for installation and repair products. The merger offered an opportunity to combine the two distribution networks.

The Current Distribution Network

Any new installation or repair by Lightning or SatTV required a set of products for the technician to complete the job. Rather than carrying these products with technicians, both companies had decided to centralize product inventories in a few locations. Annual product demand for the two companies across six regions in Europe was as shown in Table 5-16.

Zone Wireless demand Satellite Demand
Northwest 200,000 120,000
Southwest 100,000 100,000
Middle North 220,000 100,000
Middle South 120,000 120,000
Northeast 150,000 110,000
Southeast 90,000 100,000

Lightning had served its product needs from three warehouses located in Madrid, Spain; Rotterdam, Netherlands; and Krakow, Poland. SatTV had served its product needs from three warehouses located in Toulouse, France; Munich, Germany; and Budapest, Hungary. Each facility was specialized to handle either wireless or satellite products because of the historical focus of the company it belonged to. The specialization, capacity, and annual fixed cost for each facility were as shown in Table 5-17. The capacity of each warehouse is given in terms of how much annual demand it can handle. From Table 5-17, observe that the Madrid warehouse can serve demand of up to 370,000 units. The variable cost of shipping one unit (either wireless or satellite) from each warehouse location to each market is shown in Table 5-18.

Location Specialization Capacity Fixed Cost
Madrid Wireless 370,000 600,000
Rotterdam Wireless 420,000 650,000
Krakow Wireless 310,000 520,000
Toulouse Satellite 280000 475,000
Munich Satellite 290,000 488,000
Budapest Satellite 250,000 425,000
Northwest Southwest Middle North Middle South Northeast Southeast
Madrid 2.5 1.5 3 2.75 4 4.5
Rotterdam 1.75 3 1.5 3 2.5 3.5
Krakow 3.25 4 2.5 3 2 2.5
Toulouse 2 2 2.75 2.5 3.75 4
Munich 2.25 3 2.25 2.5 2.75 3
Budapest 3.5 3.75 2.5 2.5 2.5 2

The Network Options

Simone had a short term and a long term decision to make. In the short term, she had to decide whether to make all the warehouses flexible or not. Making all warehouses flexible required an investment equivalent to an additional annual cost of 200,000 euro. Flexible warehouses, however, could be used to serve demand for both wireless and satellite products.

In the longer term, Simone had to decide whether to restructure the distribution network. She could choose to close some warehouses, leave others open as they were, or double the capacity of some warehouses. Doubling the capacity of a warehouse would increase its annual fixed cost by 80 percent. Thus, if the capacity of the Madrid warehouse was doubled, its annual fixed cost would be 1,080,000 euro.

Closing a warehouse would also incur some cost, thus reducing the annual fixed cost that could be saved. Simones team estimated that closing a warehouse would save 80 percent of the annual fixed cost. Thus, closing the Madrid warehouse would still result in an annual cost of 120,000 euro because only 80 percent of the fixed cost is saved.

Study Questions

  1. What is the annual cost if Lightning uses the current network (with warehouses specialized as in Table 5-17) optimally to meet European demand?

  2. Should Simone make all warehouses flexible given the additional cost of 200,000 euro per year?

  3. What supply chain network configuration do you recommend for the long term if demand is as in Table 5-16? Should any war

**** Start with number 2 please and thank you

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!