Question: ces Given the project network and baseline Information below, complete the form to develop status reports for periods 1-4. Report the final SV, CV,


ces Given the project network and baseline Information below, complete the form to develop status reports for periods 1-4. Report the final SV, CV, CPI, and PCIB. 0 1 1 1 2 3 ooo ACT/ WP 1 2 3 L 0 3 2 0 0 0 2 2 4 5 6 12 69 7 2 3 3 om DUR ES LF 2 0 0 NNNNM 3 2 2 Schedule Information 3 1 ONMN 2 2 3 2 3 3 2 5 5 5 5 6 24 4 1 5 1 3 3 5 5 0 0 3 2 5 2 6 0 2 3 SL 1 0 0 1 2 DOO 0 Total PV 0 12 5 0 5 15 8 6. 10 9 0 Totisi PV by penod Cumulative PV by period 5 4 Baseline budget needs (5000) 1 Time period 2 3 4 8 375 44 11 19 11 30 3 3 3 5 0 5 1 63 3 7 6 0 4 3 5 6 5 ning 11 12 75 6 41 53 60 65 LEGEND ES ID EF SL SL LS DUR LF (Do not round Intermediate calculations. Enter all answers to 2 decimal places. For SPI, CPI, and PCI-B, enter your an decimals rather than percentage format (e.g.. enter 0.93 Instead of 93%).) End of Period 1 Task 1 2 3 Cumulative Totals End of Period 2 Task 1 2 3 Cumulative Totals End of Period 3 Task 2 3 4 5 6 Cumulative Totals Actual % Complete 50 30 20 Actual % Complete 100 60 85 Actual % Complete 100 8-8888 100 EV EV EV 0.00 2.70 AC 6.00 9.00 4.00 AC AC 14.00 14.00 10.00 14.00 15.00 12.00 4.00 0.00 4.00 PV PV PV CV CV + 2 CV 0.00 (1.30) SV SV SV (0.30) End of Period 4 Task 1 2 3 4 5 6 7 Cumulative Totals Actual % Complete 2 3 4 EAC 8888980 100 100 100 100 40 60 Performance Indexes Summary Period EV 1 AC EV 5.40 0.00 PV VACI AC 14.00 18.00 12.00 8.00 4.00 8.00 0.00 PV SPI CV CPI (2.60) 0.00 SV PCI-B
Step by Step Solution
3.43 Rating (153 Votes )
There are 3 Steps involved in it
Formula EVCompleteBudgetoftask PVCumulativesumofactivitycostuntiltheendofperiod BACTotalbudgetofproj... View full answer
Get step-by-step solutions from verified subject matter experts