clinics, so that the physician's role in patient care can be proactive across the care continuum. Activities and their optimistic, most likely, and pessimistic activity durations in hours shown in Table EX
Table EX
tableActivityActivity Description,Predecessor Activity,Optimistic,Most Likely,PessimisticAExploratory Phase,BMaestro Modifications,ACDialysis Clinic Interface,ADHL Lab Order Interface,AEScannedIn Documents,AFStandard Phrase Code Set,AGFamily History Module,AHOutlook Integration,AIFormulary Import and Check,AJScheduler Module,AKPhysician Encounter Sheet,BLPDA Module,KMDrugDrug and DrugAllergy Module I,NCoordination of Benefits,JOReferral Tracking Module,NPUser Training Plan,C D E F G H L M OQMarketing Plan,L P
a Calculate the mean duration for each activity.
b Calculate the variance for each activity time.
c Identify the mean and the standard deviation for each path.
d Calculate project completion probability for and hours.
A hospital is planning to add a $ million patient tower. To support both the existing hospital facility and the new patient tower, an existing energy plant will be expanded and upgraded. Equipment upgrades include a new generator, liquid oxygen tanks, cooling towers, boilers, and a chiller system to ensure adequate electricity, heating, airconditioning, h
Step by Step Solution
There are 3 Steps involved in it