Question: Chapter 1 4 ( pp . 5 8 0 - 5 8 1 ) : Problems 1 4 . 2 , 1 4 . 3

Chapter 14(pp.580-581): Problems 14.2,14.3B,14.9, and 14.13C
14.2You are expected to have the gift bags in Problem 14.1 ready at 5 p.m. However, you need to personalize the items (monogrammed pens, note pads, literature from the printer, etc.). The lead time is 1 hour to assemble 200 Js once the other items are prepared. The other items will take a while as well. Given the volunteers you have, the other time estimates are item K (2 hours), item L (1 hour), and item M (4 hours). Develop a time-phased assembly plan to prepare the gift bags. 14.3 As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, two springs, and four clamps. The base is assembled from one clamp and two housings. Each clamp has one handle and one casting. Each housing has two bearings and one shaft. There is no inventory on hand. Determine the gross quantities needed of each item if you are to assemble 50 brackets.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!