A time study was conducted on a job that contains four elements.
The observed time and performance ratings for six cycles are shown in the following table.
OBSERVATIONS minutes per cycle
Element
Performance
Rating
a Determine the average cycle time for each element
OBSERVATIONS minutes per cycle
Element
Average
OTmin
b Find the normal time for each element
Element
NT
OT x PR
c Assuming an allowance factor of percent of job time, compute the standard time for this job.
Standard Time