Question: Exercise 2 : A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are

Exercise 2:
A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table.
\table[[Element,\table[[Performance],[rating]],Cycle],[1,2,3,4,5,6
 Exercise 2: A time study was conducted on a job that