Question: CLO 2 . 5 Select, use, and adapt advanced digital technological and ICT tools in solving modeling problems [ 2 Points ] Using the LCG

CLO 2.5 Select, use, and adapt advanced digital technological and ICT tools in solving modeling problems
[2Points] Using the LCG defined by m=32,a=7,c=13, and Z0=11 generate all possible random numbers. Does it has a full period? If no, adjust the value of "a" and generate the full period random number. Use all available checks.
CLO 3.1 Commitment of integrity and professionality when dealing with various modeling problems. CLO 2.2 Choose and apply the suitable modeling method.
CLO 2.3 Use the appropriate modeling technique based on the problem nature.
[3Points]
a) Write down all statistical models appropriate to the following application areas:
Queuing systems
Inventory and supply-chain systems
Reliability and maintainability
Limited data
b) A computer repair person is "beeped" each time there is a call for service. The number of beeps per hour Poisson (=2 per hour). Find:
i. The probability of three beeps in the next hour:
c) A lamp per hour), hence, on average, 1 failure per 3 hours.
ii. The probability that the lamp lasts longer than its mean life is:
iii. The probability that the lamp lasts between 2 to 3 hours is:
iv. The probability that it lasts for another hour given it is operating for 2.5 hours:
CLO 2.2 Choose and apply the suitable modeling method.
CLO 2.3 Use the appropriate modeling technique based on the problem nature.
CLO 3.1 Commitment of integrity and professionality when dealing with various modeling problems.
[1Point] Using the Inverse-transform Technique and for the given exponential distribution function compute the desired random variety "x" for any random Number "R" where PDF=f(x)=e-x and CDF=F(x)=1-e-x, Calculate X for R=0.1754 and =1
CLO 2.1 Apply different types of models and validate them.
CLO 2.3 Use the appropriate modeling technique based on the problem nature.
CLO 3.1 Commitment of integrity and professionality when dealing with various modeling problems.
[1.5Point] For the following terminating simulations suggest the event E that specifies the length of each run as well as the initial conditions.
a) A bank opens from 9 a.m. to 5 p.m.
b) A Football game between a blue team and a red team
c) An aerospace manufacturer receives a contract to produce 100 airplanes, which must be delivered within 18 months. The company would like to simulate various manufacturing configurations to see which one can meet the delivery deadline at least cost.
CLO 2 . 5 Select, use, and adapt advanced digital

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Electrical Engineering Questions!