Question: Come up with risk Matrix table, identifying 4 to 5 risk factors Risk Factor Probability Impact Mitigation Javacom LAN Project* Javacom is a small, information

Come up with risk Matrix table, identifying 4 to 5 risk factors
Risk Factor Probability Impact Mitigation
Javacom LAN Project* Javacom is a small, information systems consulting firm located in Meridian, Louisiana. Javacom has just been hired to design and install a local area network: (LAN) for the city of Meridian's social wvelfare agency. You are the manager for the project, which includes two Javacom professionals and one intern from a local university. You have just finished a preliminary scope statement for the project (see below). You are now brainstorming potential risks associated with the project. 1. Identify potential risks associated with this project. Try to come up with at least five different risks. 2. Use a risk assessment matrix similar to Figure 7.4 to analyze identified risks. 3. Develop a risk response matrix similar to Figure 7.7 to outline how you would deal with each of the risks. PROJECT SCOPE STATEMENT PROJECT OBJECTIVE To design and install a local area network (LAN) within one month with a budget not to exceed $82,000 for the Meridian Social Service Agency. DELIVERABLES - Twenty workstations. - Server with dual Pentium processor. - Two Hewlett-Packard laser jet Si/Si MX printers. - Windows NT server and workstation operating system. - Four hours of introduction training for client's personnel. - Sixteen hours of training for client network administrator. - Fully operational LAN system. MILESTONES 1. Hardware January 22. 2. Setting users' priority and authorization January 26 . 3. In-house whole network test completed February 1. 4. Client site test completed February 2 . 5. Training completed February 16. TECHNICAL REQUIREMENTS 1. Workstations with 17 -inch monitors, Pentium Il processor, 128 MB RAM. 4MB SVGA, 32X CD-ROM, zip drive, Ethernet card 4.0GB hard drive. 2. PCl 64 Ethernet LAN interface cards and Ethernet connections (must transmit at least 100mbps ). 3. System must support Window's NT platform and be Y2K compliant. LIMITS AND EXCLUSIONS 1. System maintenance and repair only up to one month after final inspection. 2. Warranties transferred to client. "This case was prepared with the assistance of Budiyoso Kurniawai
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
