Question: The case study below is Java com LAN project Come up with risk Matrix table, identifying 4 to 5 risk factors: Risk Factor Probability Impact
The case study below is Java com LAN project
Come up with risk Matrix table, identifying 4 to 5 risk factors:
Risk Factor Probability Impact Mitigation

Javacom is a small, information systems consulting firm located in Merician, Louisiana. Javacom has just been hired to design and install a local area network: (LAN) for the city of Meridian's social welfare agency. You are the manager for the project, which includes two Javacom professionals and one intern from a local university. You have just finished a preliminary scope statement for the project (see below). You are now brainstorming potential risks associated with the project. 1. Identify potential risks associated with this project. Try to come up with at least five different risks. 2. Use a risk assessment matrix similar to Figure 7.4 to analyze identified risks. 3. Develop a risk response matrix similar to Figure 7.7 to outline how you would deal with each of the risks. PROJECT SCOPE STATEMENT PROJECT OBIECTIVE To design and install a local area network (LAN) within one month with a budget not to exceed $82,000 for the Meridian Social Service Agency. DELIVERABLES - Twenty workstations. - Server with dual Pentium processor. - Two Hewleti-Packard laser jet Si/Si MX printers. - Windows NT server and workstation operating system. - Four hours of introduction training for client's personnel. - Sixteen hours of training for client network administrator. - Fully operational LAN systern. MILESTONES 1. Hardware January 22. 2. Setting users' priority and authorization January 26. 3. In-house whole network test completed February 1. 4. Client site test completed February 2. 5. Training compieted February 16. TECHNICAL REQUIREMENTS 1. Workstations with ] 7-inch monitors, Pentium II processor, 128MB RAM, 4MB SVGA, 32XCDROM, zip drive, Ethernet card 4.0GB hard drive. 2. PCl64 Ethernet LAN interface cards and Ethernet connections (must transmit at least 100 mbps). 3. System must support Windows NT platform and be Y2K compliant. LIMITS AND EXCLUSIONS 1. System maintenance and repait oniy up to one month after firal inspection. 2. Warranties transferred to client