Question: Complete task 3 based on the document given below: Please give proper answer as one more answer is provided earlier but not match the question

 Complete task 3 based on the document given below: Please give

proper answer as one more answer is provided earlier but not match

Complete task 3 based on the document given below:

the question requirement. Background A developer intends to develop a new residential

building, which consists of two units at East Hills NSW. Having made

enquiries with local government, plans have been drawn in accordance with theappropriate Development Application (DA) and the submission is currently with council for

approval. The developer has approached your Company on recommendation as a builder

Please give proper answer as one more answer is provided earlier but not match the question requirement.

Background A developer intends to develop a new residential building, which consists of two units at East Hills NSW. Having made enquiries with local government, plans have been drawn in accordance with the appropriate Development Application (DA) and the submission is currently with council for approval. The developer has approached your Company on recommendation as a builder with the reputation for delivering these types of projects. The intention is to enter into a design and construct contract as soon as Council approves the DA, which is envisaged by the end of the month. You are to act as the construction planner who is employed in-house by the contractor. Development Application (DA) drawings 001 to 012 inclusive are available @vUWS website. Work out the resource requirements and durations for a representative sample of activities (at least 30 activities should be included) taking into account the quantities, crew sizes, labour and plant productivity rates and efficient work cycles. (Include copies of the reference labour/plant productivity rates used, e.g., Rawlinsons, Cordels, etc). The quantities are derived from the measurements you make for each activity. Assumptions can be made when necessary. Task Mode - Task Name - Building project - Site preparation Building Permits Elevator permits Substanital Completion Date Physical Completion Date - Fondation Excavate foundations Excavate elevator pit Form column piers and spread foundations Rough-in electric and plumbing in elevator Form elevator pit walls Set reinforcing and anchor bolts Pour column piers and foundations Pour concrete elevator walls Cure elevator wall concrete Cure piers and foundations Strip wall forms Strip column piers and foundation forms Task Mode - Task Name Internal Finishes Insulation Place wall Insulation Conduct insulation inspection Drywall Install drywall Tape and float - Paint and Wallpaper Paint all Floor Paint exterior siding trim work Task Mode - Task Name Internal Finishes Insulation Place wall Insulation Conduct insulation inspection Drywall Install drywall Tape and float - Paint and Wallpaper Paint all Floor Paint exterior siding trim work Cabinets Install Kitchen cabinets Install master bath Install hall bath Install chair rails, crown moldings Finish Plumbing Kitchen plumbing Bathroom plumbing Side plumbing External finishes Complete exterior brick Complete exterior siding Complete exterior paint External works Name plates Building Name with Number Other construction

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Databases Questions!