Question: Complete the cross section, following these steps. (6 pt) Mark the ground surface elevation and connect. Mark the contacts in, measuring down from the ground
Complete the cross section, following these steps. (6 pt) Mark the ground surface elevation and connect. Mark the contacts in, measuring down from the ground surface at each well. Mark the total depth of each boring. Keep in mind that the bottom of the borehole is not a contact unless it is specified that the drilling reached a different rock type
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
