Question: Completion Status Prepare a detailed cost estimate using hand calculation for the following work tasks. For each work task, calculate the following -Total labor

Completion Status Prepare a detailed cost estimate using hand calculation for the

Completion Status Prepare a detailed cost estimate using hand calculation for the following work tasks. For each work task, calculate the following -Total labor cost, total material cost, and total equipment cost. -Total cost and unit cost of total cost Work Task Placing concrete for 8 thick wall using a pump Curing concrete using sprayed membrane compound Building CMU wall including reinforcement, mortar and grout Placing footing reinforcement Quantity Unit Material Unit Cost 350 CY $61.50 4,750 SFCA $0.035 3,000 SF $2.20 10 Ton $850 Productivity Work Task (normal 8-hr Unit of Required Daily Required Crew & Cost day) Measure Placing concrete Number Equipment Hourly Cost walls, 8 in thick, pumped 100 2 1 Labor foreman $20.50 S Labor $12.10 1 Cement mason $17.00 1 Equipment operator $16.00 2 Vibrators 544 1 Concrete pump $708.60 Concrete curing Sprayed membrane curing compound 9500 SFCA 2 Labor $12.30 Masonry Reinforcing in place Footings #4 to #7 CMU wall including reinforcement, mortar and grout. 360 2.10 Ton 4 Rodman $41.30 3 Bricklayers $38.50 SF 2 Bricklayer Helpers $28.65 Click Save and Submit to save and submit. Click Save All Answers to save all answers Book Air

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!