Question: Computer Y runs Application B with a cycle time of 2 . 5 GHz . The instruction mix includes 3 0 % simple math (

Computer Y runs Application B with a cycle time of 2.5 GHz.
The instruction mix includes
30% simple math (1 CPI),
15% branching (3 CPI),
25% multiplication (2 CPI), and
30% floating-point (5 CPI).
The application consists of 1.2 million instructions.
A: What is the average CPI
B: Calculate the CPU time on Computer Y.