Question: Consider a FAME lab experiment where a part needs to be machined. Five student groups are mac proceed through two operations with the sequence Drilling

Consider a FAME lab experiment where a part needs to be machined. Five student groups are mac proceed through two operations with the sequence Drilling \\( >> \\) Lathe. The following table lists the group's part for each operation. Optimize the schedule for machining such that all 5 parts are macl (minimize makespan). B. Drilling for the last part in the optimized schedule will complete at